Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Analyse geotechnical structures
Conduct computer analysis of geotechnical structures
Geotechnic
Geotechnical
Geotechnical auxiliary measure
Geotechnical investigation
Geotechnical mesure
Geotechnical research
Geotechnical site investigation
Geotechnical study
Geotechnics
Monitor geotechnical structures
National Geotechnical Institute
Observe geotechnical structures
Perform computer analyses of geotechnical structures
Plan geotechnical investigations in the field
Planning geotechnical field investigations
Planning geotechnical investigations in the field
Research in applied geology
Research in geotechnics

Traduction de «geotechnics » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous


analyse geotechnical structures | observe geotechnical structures | monitor geotechnical structures | perform ongoing assessments of the performance of railway geotechnical structures

surveiller des structures géotechniques


plan geotechnical investigations in the field | planning geotechnical field investigations | plan geotechnical investigations in the field | planning geotechnical investigations in the field

planifier des enquêtes géographiques de terrain


assess geotechnical structures through use of a computer | conduct computer analysis of geotechnical structures | conduct computer-aided evaluations of geotechnical structures | perform computer analyses of geotechnical structures

effectuer des analyses informatiques de structures géotechniques


geotechnical investigation [ geotechnical site investigation | geotechnical study ]

étude géotechnique [ étude de géotechnique | reconnaissance géotechnique ]


geotechnical research [ research in geotechnics | research in applied geology ]

recherches géotechniques [ recherches de géologie appliquée ]


geotechnical mesure (1) | geotechnical auxiliary measure (2)

mesure de stabilisations




National Geotechnical Institute

Institut national de géotechnique


TRADUCTIONS EN CONTEXTE
Drilling and foundation equipment — Safety — Part 2: Mobile drill rigs for civil and geotechnical engineering, quarrying and mining

Machines de forage et de fondation — Sécurité — Partie 2: Machines mobiles de forage de génie civil, de géotechnique, de forage d’eau, d’exploration de sol, d’énergie géothermique, de mines et carrières


This is a list of the information provided in this case: analysis under the federal Species at Risk; impact of underwater noise generated by the geotechnical study of the Beluga in the area of the point of Gros-Cacouna project; analysis under the federal Species at Risk Act; analysis of the proposed project geotechnical investigation; results of all previous work; results of various previous studies on the impact of noise on aquatic environment; and scientific response 2014/020 impact of geophysics Cacouna Harbour on the St. Lawrence belugas.

Voici une liste des renseignements fournis: analyse faite en vertu de la Loi sur les espèces en péril, répercussions du bruit sous-marin produit par l’étude géotechnique sur les bélugas dans le secteur du projet de la pointe de Gros-Cacouna; analyse de l’investigation géotechnique du projet proposé; résultats de tous les travaux précédents; résultats de diverses études menées précédemment sur les répercussions du bruit sur le milieu aquatique; et réponse scientifique 2014/020 concernant les répercussions géophysiques du port de Cacouna sur les bélugas du Saint-Laurent.


In the Canada Line, the province was going to share geotechnical risk, but offered the opportunity for the bidders to choose whether they would bid on that basis or offer to take that geotechnical risk.

En ce qui concerne Canada Line, la province allait partager le risque géotechnique, mais a permis aux soumissionnaires s'ils voulaient assumer ce risque ou le laisser au public.


the waste facility is suitably located, taking into account in particular Community or national obligations relating to protected areas, and geological, hydrological, hydrogeological, seismic and geotechnical factors, and is designed so as to meet the necessary conditions for, in the short and long‐term perspectives, preventing pollution of the soil, air, groundwater or surface water, taking into account especially Directives 76/464/EEC , 80/68/EEC and 2000/60/EC, and ensuring efficient collection of contaminated water and leachate as and when required under the permit, and reducing erosion caused by water or wind as far as it is technic ...[+++]

l'installation soit implantée sur un site adéquat, notamment sur le plan des obligations communautaires ou nationales en ce qui concerne les zones protégées et les conditions géologiques, hydrologiques, hydrogéologiques, sismiques et géotechniques, et qu'elle soit conçue de manière à remplir les conditions nécessaires, à court et à long terme, pour prévenir la pollution du sol, de l'air, des eaux souterraines ou des eaux de surface, compte tenu notamment des directives 76/464/CEE , 80/68/CEE et 2000/60/CE, pour assurer une collecte efficace des lixiviats et des eaux contaminés dans les conditions prévues par l'autorisation et pour réduir ...[+++]


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
ensures the long-term geotechnical stability of any dams or heaps rising above the pre-existing ground surface.

assure la stabilité géotechnique à long terme des digues ou des terrils s'élevant au-dessus de la surface du sol préexistante.


the waste facility is suitably located, taking into account in particular Community or national obligations relating to protected areas, and geological, hydrological, hydrogeological, seismic and geotechnical factors, and is designed so as to meet the necessary conditions for, in the short and long-term perspectives, preventing pollution of the soil, air, groundwater or surface water, taking into account especially Directives 76/464/EEC , 80/68/EEC and 2000/60/EC, and ensuring efficient collection of contaminated water and leachate as and when required under the permit, and reducing erosion caused by water or wind as far as it is technic ...[+++]

l'installation soit implantée sur un site adéquat, notamment sur le plan des obligations communautaires ou nationales en ce qui concerne les zones protégées et les conditions géologiques, hydrologiques, hydrogéologiques, sismiques et géotechniques, et qu'elle soit conçue de manière à remplir les conditions nécessaires, à court et à long terme, pour prévenir la pollution du sol, de l'air, des eaux souterraines ou des eaux de surface, compte tenu notamment des directives 76/464/CEE , 80/68/CEE et 2000/60/CE, pour assurer une collecte efficace des lixiviats et des eaux contaminés dans les conditions prévues par l'autorisation et pour réduir ...[+++]


to ensure short and long-term safe disposal of the extractive waste, in particular by considering, during the design phase, management during the operation and after-closure of a waste facility and by choosing a design which prevents or at least minimises any long-term negative effects attributable to migration of airborne or aquatic pollutants from the waste facility, and to ensure the long-term geotechnical stability of any dams or heaps rising above the pre-existing ground surface .

assurer l'élimination sûre à court et à long terme des déchets de l'industrie extractive, en particulier en tenant compte, durant la phase de conception, de la gestion pendant l'exploitation et après la fermeture de l'installation de gestion de déchets, et en choisissant une conception visant à prévenir ou tout au moins à réduire au minimum tout effet négatif à long terme imputable à la migration de polluants aquatiques ou atmosphériques à partir de l'installation de gestion de déchets et à assurer la stabilité géotechnique à long terme des digues ou terrils s'élevant au-dessus de la surface du sol préexistante .


Q-97 — Mr. Stoffer (Sackville Musquodoboit Valley Eastern Shore) — In regard to the Tulsequah Chief Mine project: (a) which of the seventy stream crossings, sixty-four culverts and seven bridges to be undertaken in association with the proposed project pose the highest risks to the spawning or rearing habitats of chinook, sockeye, coho, pink, chum salmon, and to the water quality in the area; (b) which of the proposed undertakings pose the greatest risk to other fish species in the area such as Dolly Varden char and whitefish, and cutthroat, bull and steelhead trout; (c) what are the estimated costs to pump back and treat the metals tailing seepage entering the Shazah wetland as a result of the project operations; (d) what are the concer ...[+++]

Q-97 — M. Stoffer (Sackville Musquodoboit Valley Eastern Shore) — En ce qui concerne le projet minier Tulsequah Chief Mine : a) quels sont ceux des soixante-dix passages de cours d'eau, soixante-quatre ponceaux et sept ponts dont le projet nécessitera la construction qui représentent les risques les plus élevés pour les aires de frai et d'alevinage du saumon quinnat, rouge, coho, rose et kéta, ou la qualité de l'eau dans la région; b) quels sont ceux de ces travaux qui représentent les risques les plus élevés pour d'autres espèces de poissons vivant dans les eaux de la région, notamment l'omble et le corégone Dolly Varden, la truite fardée, l'omble à tête plate et la truite arc-en-ciel; c) quel est le coût estimatif du pompage et du trait ...[+++]


Q-97 — Mr. Stoffer (Sackville Musquodoboit Valley Eastern Shore) — In regard to the Tulsequah Chief Mine project: (a) which of the seventy stream crossings, sixty-four culverts and seven bridges to be undertaken in association with the proposed project pose the highest risks to the spawning or rearing habitats of the chinook, sockeye, coho, pink, chum salmon, and to the water quality in the area; (b) which of the proposed undertakings pose the greatest risk to other fish species in the area such as Dolly Varden char and whitefish, and cutthroat, bull and steelhead trout; (c) what are the estimated costs to pump back and treat the metals tailing seepage entering the Shazah wetland as a result of the project operations; (d) what are the co ...[+++]

Q-97 — M. Stoffer (Sackville Musquodoboit Valley Eastern Shore) — En ce qui concerne le projet minier Tulsequah Chief Mine : a) quels sont ceux des soixante-dix passages de cours d'eau, soixante-quatre ponceaux et sept ponts dont le projet nécessitera la construction qui représentent les risques les plus élevés pour les aires de frai et d'alevinage du saumon quinnat, rouge, coho, rose et kéta, ou la qualité de l'eau dans la région; b) quels sont ceux de ces travaux qui représentent les risques les plus élevés pour d'autres espèces de poissons vivant dans les eaux de la région, notamment l'omble et le corégone Dolly Varden, la truite fardée, l'omble à tête plate et la truite arc-en-ciel; c) quel est le coût estimatif du pompage et du trait ...[+++]


They believed it was a geotechnical problem and they would hire someone to conduct a geotechnical study.

Selon eux, il s'agissait d'un problème qui relevait de la géotechnique, et ils engageraient un spécialiste du domaine pour faire une étude.


w