Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Actual breaking load of rope
Auxiliary hoist rope
Cable hoist
Hoist cable
Hoist line
Hoist rope
Hoisting cable
Hoisting line
Hoisting rope
Hoistline
Lift cable
Lifting cable
Lifting rope
Load hoist rope
Measured breaking load of rope
Mining winding rope
Wire-rope hoist

Translation of "load hoist rope " (English → French) :

TERMINOLOGY
see also In-Context Translations below
hoist cable [ hoisting cable | hoisting rope | load hoist rope | lift cable | lifting rope | hoistline | hoist line | hoisting line ]

câble de levage


hoisting rope | hoisting cable | lifting rope | lifting cable | hoist rope | hoist cable | lift cable

câble de levage


actual breaking load of rope | measured breaking load of rope

charge de rupture effective du câble | charge de rupture mesurée du câble




hoist rope | mining winding rope

câble d'extraction minière




hoisting rope

câble de suspension [ câble de levage ]




chain hoist drive belt pulley (block) rope transmission belt or cable winch wire

bloc poulie câble corde courroie ou câble de transmission palan treuil


IN-CONTEXT TRANSLATIONS
78 (1) All hoist ropes, other than endless hoist ropes, shall be connected to their loads by means of a socket that is designed and installed in accordance with good engineering practice.

78 (1) Les câbles d’extraction, sauf ceux sans fin, doivent être reliés à leur charge au moyen d’un raccord conçu et installé conformément aux méthodes d’ingénierie indiquées.


(2) No hoist rope referred to in subsection (1) shall be used for the transportation of persons in a shaft unless two trial winds have been made with the cage or trip loaded to the maximum authorized load of the hoist.

(2) Il est interdit d’utiliser un câble d’extraction visé au paragraphe (1) pour le transport des personnes dans un puits, à moins que deux courses d’essai n’aient été effectuées avec une cage ou un convoi comportant la charge maximale autorisée de la machine d’extraction.


(b) the first man car of a trip on a direct hoist rope system shall be secured, in addition to the primary fastening arrangement referred to in paragraph 83(3)(a), by a secondary fastening arrangement that is capable of holding at least 200 per cent of the maximum tensile load of the trip in the event of a failure of the primary fastening arrangement.

b) d’autre part, en plus du dispositif de fixation primaire visé à l’alinéa 83(3)a), le premier wagonnet de transport des personnes dans un système à câble direct doit être attaché au moyen d’un dispositif de fixation secondaire pouvant supporter au moins 200 pour cent de la charge maximale en tension du convoi advenant une défaillance du dispositif de fixation primaire.




Others have searched : actual breaking load of rope     auxiliary hoist rope     cable hoist     hoist cable     hoist line     hoist rope     hoisting cable     hoisting line     hoisting rope     hoistline     lift cable     lifting cable     lifting rope     load hoist rope     measured breaking load of rope     mining winding rope     wire-rope hoist     


datacenter (1): www.wordscope.ca (v4.0.br)

'load hoist rope' ->

Date index: 2021-03-07
w