Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Air conditioning installation
Air conditioning plant
Air conditioning power plant
Air conditioning system
Air handling installation
Air-conditioning and ventilation plant
Air-conditioning plant
Air-conditioning system
Central air conditioning plant
Central air-handling unit
Cockpit air conditioning plant
Refrigeration plant

Translation of "Air conditioning power plant " (English → French) :

TERMINOLOGY
see also In-Context Translations below
central air conditioning plant [ air conditioning power plant ]

centrale de conditionnement [ centrale de conditionnement d'air | groupe central de conditionnement ]


air-conditioning plant | refrigeration plant

centrale de froid


central air conditioning plant | central air-handling unit

centrale de conditionnement d'air


air conditioning plant | air handling installation

installation de conditionnement d'air


air conditioning system [ air-conditioning system | air conditioning plant | air-conditioning plant | air conditioning installation | air-conditioning and ventilation plant ]

installation de conditionnement d'air [ installation de conditionnement de l'air | installation de conditionnement d'ambiance | installation de génie climatique | installation climatique | système de conditionnement d'air ]


air conditioning plant | air-conditioning plant

installation de conditionnement d'air




cockpit air conditioning plant

système de conditionnement d'air du poste de pilotage
IN-CONTEXT TRANSLATIONS
Activities shall focus on research, development and full scale demonstration of new smart energy grid technologies, back-up and balancing technologies enabling higher flexibility and efficiency, including conventional power plants, flexible energy storage, systems and market designs to plan, monitor, control and safely operate interoperable networks, including standardisation issues, in an open, decarbonised, environmentally sustainable, climate-resilient and competitive market, under normal and emergency conditions.

Les activités se concentrent sur la recherche, le développement et la démonstration en grandeur réelle de nouvelles technologies de réseau énergétique intelligent, de technologies d'appoint et de compensation permettant une plus grande souplesse et une plus grande efficacité, notamment des centrales électriques classiques, de systèmes souples de stockage de l'énergie et des modèles de marché devant permettre de planifier, surveiller, contrôler et exploiter en toute sécurité des réseaux interopérables, y compris en ce qui concerne les questions de normalisation, sur un marché ouvert, compétitif, décarboné, respectueux de l'environnement e ...[+++]


Lastly, the closure and safe decommissioning of the Medzamor Nuclear Power Plant (MNPP) and the early adoption of a road map/action plan to this effect shall remain a key objective, taking into consideration the need for its replacement with new capacity to ensure Armenia's energy security and conditions for sustainable development.

Enfin, la fermeture et le déclassement sécurisé de la centrale nucléaire de Medzamor et l'adoption rapide d'une feuille de route/d'un plan d'action à cet effet resteront un objectif prioritaire compte tenu de la nécessité de remplacer cette centrale par de nouvelles capacités afin de garantir la sécurité énergétique de l'Arménie et de créer les conditions d'un développement durable.


The Commission's 2014 Guidelines on State Aid for Environmental Protection and Energy allow Member States to grant state aid for high efficiency combined heat and power plants, subject to certain conditions.

Les lignes directrices de la Commission de 2014 concernant les aides d’État à la protection de l’environnement et à l’énergie autorisent les États membres à octroyer des aides d'État à des installations de cogénération de chaleur et d'électricité à haut rendement, à certaines conditions.


In cases where the buyer of the switchyard is the same as the buyer of the power plant and the contract is concluded in relation to the original switchyard for that power plant, the terms and conditions for the original switchyard shall not exceed those for the renewable energies power plant; and

dans les cas où l'acheteur de la ligne d'interconnexion est le même que l'acheteur de la centrale et où le contrat est conclu en rapport avec la ligne d'interconnexion initiale pour cette centrale, les conditions et modalités applicables à la ligne d'interconnexion initiale n'excéderont pas celles accordées pour la centrale à énergie renouvelable; et


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Activities shall focus on research, development and full scale demonstration of new smart energy grid technologies, back-up and balancing technologies enabling higher flexibility and efficiency, including conventional power plants, flexible energy storage, systems and market designs to plan, monitor, control and safely operate interoperable networks, including standardisation issues, in an open, decarbonised, environmentally sustainable, climate-resilient and competitive market, under normal and emergency conditions.

Les activités se concentrent sur la recherche, le développement et la démonstration en grandeur réelle de nouvelles technologies de réseau énergétique intelligent, de technologies d'appoint et de compensation permettant une plus grande souplesse et une plus grande efficacité, notamment des centrales électriques classiques, de systèmes souples de stockage de l'énergie et des modèles de marché devant permettre de planifier, surveiller, contrôler et exploiter en toute sécurité des réseaux interopérables, y compris en ce qui concerne les questions de normalisation, sur un marché ouvert, compétitif, décarboné, respectueux de l'environnement e ...[+++]


In accordance with the Commission statement to the European Council (8) regarding Article 10(3) of the ETS Directive on the use of revenues generated from the auctioning of allowances, EEA States may use those revenues, between 2013 and 2016, to support the construction of highly efficient power plants, including new power plants that are carbon capture and storage (CCS)-ready. As a minus to this definition, under Article 33 of Council Directive 2009/31/EC of 23 April 2009 on the geological storage of carbon dioxide (9), EEA States must ensure that operators of combustion plants ...[+++]

Conformément à la déclaration de la Commission au Conseil européen (8) concernant l'article 10, paragraphe 3, de la directive relative au SEQE, sur l'utilisation du produit de la mise aux enchères des quotas, les États de l'EEE peuvent utiliser le produit de cette mise aux enchères, entre 2013 et 2016, afin de contribuer à la construction de centrales à haut rendement, y compris de nouvelles centrales électriques aptes au captage et au stockage géologique du CO2 (centrales aptes au CSC) L'article 33 de la directive 2009/31/CE du Conseil du 23 avril 2009 relative au stockage géologique du dioxyde de carbone (9) prévoit toutefois que les É ...[+++]


On the basis of the above assessment, the Commission takes the view that the main terms and conditions of the purchase obligation enshrined in the PPAs, i.e. the capacity reservations and guaranteed off-take by MVM under such conditions as to ensure the return on investment of the power plants by shielding them from the commercial risks of the operation of their plant, constitute State aid ...[+++]

Sur la base de l’analyse ci-dessus, la Commission considère que les principales conditions de l’obligation d’achat figurant dans les AAE, à savoir les mises en réserve de capacités et les achats garantis par MVM dans des conditions telles qu’elles garantissent le retour sur investissement des centrales en les protégeant des risques commerciaux liés à leur exploitation constituent une aide d’État au sens de l’article 87, paragraphe 1, du Trait CE.


As a result of the preliminary analysis, outlined in recitals 180 to 190, the Commission concluded that in order to establish whether an advantage existed, it should be ascertained whether under the conditions prevailing when Hungary joined the European Union, a market operator would have granted the generators a similar guarantee as that enshrined in the PPAs, namely a purchase obligation on the part of MVM of the capacities reserved in the PPAs (corresponding to a substantial proportion and, in many cases, to all the power plant's a ...[+++]vailable capacities), a guaranteed minimum quantity of generated power over a period of 15 to 27 years corresponding to the typical expected lifetime of the assets concerned or their depreciation, at a price covering the plant's fixed and variable costs (including fuel costs) (53).

À la suite de l’analyse préliminaire exposée aux considérants 180 à 190, la Commission a conclu que pour évaluer l’existence de l’avantage il faut examiner si, dans les circonstances existant au moment de l’adhésion de la Hongrie à l’Union européenne, un opérateur de marché aurait ou non accordé aux producteurs une garantie similaire à celle prévue par les AAE, à savoir une obligation, pour MVM, d’acheter les capacités réservées dans les AAE (qui correspond à la totalité ou à la majeure partie de la capacité dont dispose la centrale é ...[+++]


The independent system (SEI) is composed of the unbound system (Sistema Eléctrico Não Vinculado, SENV), which operates under free market conditions (i.e. most of this power is finally sold to the customers who switch out of the regulated system), and the special regime system (Produtores em regime especial, PRE), in which generation by co-generation plants, mini-hydro plants, and other renewable energies such as wind power plants is supplied to REN at regulated tariffs.

Le système indépendant («SEI») se compose du système non lié (Sistema Eléctrico Não Vinculado, «SENV»), qui fonctionne dans des conditions de marché libre (la majeure partie de cette électricité étant finalement vendue aux clients qui sortent du système réglementé), et du système du régime spécial (Produtores em regime especial, «PRE»), dans lequel l'électricité produite par les centrales de cogénération, les installations hydroélectriques de très petite taille et d’autres installations utilisant des sources d'énergie renouvelables, telles que l'énergie éolienne, est fournie à REN aux tarifs réglementés.


air pollution: this is largely due to emissions from stationary sources (power plants and district heating installations).

pollution de l'air: elle provient essentiellement des émissions de sources fixes (centrales électriques, installations de chauffage urbain).




datacenter (1): www.wordscope.ca (v4.0.br)

'Air conditioning power plant' ->

Date index: 2022-11-13
w