Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Assess operating cost
BOT
Build-operate-transfer
Build-operate-transfer arrangement
Build-operate-turnover
Building operation cost index
Calculate costs of repair operations
Calculate the cost of repair operations
Calculate the costs of repair operations
Charges relating to the issue operation
Cost of issue
Estimating of operating cost
Flotation costs
Groundside cost
Groundside-operation cost
Issuing costs
Landside-operation cost
Measure costs of repair operations
Monitor oil rig costs
Monitoring oil rig costs
Monitoring oil rig operating costs
Oil rig operating cost monitoring
Operating cost assessment
Operating cost estimation
Pre-operating costs
Pre-operating expenses
Pre-production costs
Pre-production expenses
Start-up costs
Startup costs

Traduction de «Building operation cost index » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
building operation cost index

indice des frais d'exploitation des immeubles


estimating of operating cost | operating cost assessment | assess operating cost | operating cost estimation

évaluer le coût d’exploitation


monitoring oil rig costs | monitoring oil rig operating costs | monitor oil rig costs | oil rig operating cost monitoring

contrôler les coûts d’une plateforme pétrolière | contrôler les coûts d’une plate-forme pétrolière


startup costs | start-up costs | pre-production expenses | pre-production costs | pre-operating expenses | pre-operating costs

frais de mise en marche | frais de mise en exploitation | coûts de préexploitation


Seminar on Building Operations in Low-Cost Housing Construction

Séminaire sur les opérations de construction dans l'édification d'habitations à bon marché


charges relating to the issue operation | cost of issue | flotation costs | issuing costs

coût d'émission | frais d'émission


build-operate-transfer arrangement [ BOT | build-operate-transfer | build-operate-turnover ]

contrat de construction-exploitation-transfert


start-up costs | pre-operating costs | pre-operating expenses | pre-production costs | pre-production expenses

coûts de pré-exploitation | frais de mise en marche | frais de mise en exploitation


groundside cost [ groundside-operation cost | landside-operation cost ]

coût d'exploitation côté ville


calculate the cost of repair operations | calculate the costs of repair operations | calculate costs of repair operations | measure costs of repair operations

calculer les coûts des opérations de réparation
TRADUCTIONS EN CONTEXTE
Not only is the cost of certification extraordinarily low compared to other building certification programs, but BOMA BESt also provides energy and environmental targets that reduce a building’s environmental and energy footprint and therefore reduce building operational costs.

Non seulement le coût de cette certification est incroyablement bas comparé à celui d’autres programmes de certification d’immeubles, mais BOMA BESt offre en outre des cibles énergétiques et environnementales qui permettent de réduire l’empreinte écologique et énergétique d’un immeuble et, conséquemment, ses coûts d’exploitation.


This benchmarking mechanism is established by a framework methodology that allows the comparison of energy efficiency measures, measures incorporating renewable energy sources and different combination of these measures (in packages and variants), based on primary energy performance (in kWh/m2) and costs (i.e. sum of investment costs in energy measures, maintenance and operating costs, energy costs, earnings from energy produced, etc.), taking into account an estimated building ...[+++]

Ce mécanisme de référence prend la forme d'un cadre méthodologique qui permet de comparer les mesures écoénergétiques, les mesures intégrant des sources d’énergie renouvelable et les différentes combinaisons de ces mesures (en groupes et variantes), sur la base de la performance énergétique primaire (en kWh/m²) et des coûts (c’est-à-dire la somme des coûts d’investissement dans les mesures énergétiques, des coûts de maintenance et d’exploitation, des coûts de l’énergie, des recettes tirées de l’énergie produites, etc.), en tenant compte d’une durée de vie ...[+++]


Question No. 578 Ms. Jinny Jogindera Sims: With regard to the planned reductions in departmental spending for the International Assistance Envelope announced in Budget 2012, for the each of the fiscal years between 2012-2013 and 2014-2015: (a) what is the total dollar amount of reductions in official development assistance; (b) what is the total dollar amount of reductions in non-official development assistance; (c) what is the total dollar amount of reductions to administrative costs at the Canadian International Development Agency (CIDA); (d) when will the restructuring ...[+++]

Question n 578 Mme Jinny Jogindera Sims: En ce qui concerne les réductions prévues dans les dépenses ministérielles au titre de l’enveloppe de l’aide internationale et annoncées dans le budget 2012, pour chaque exercice allant de 2012-2013 à 2014-2015: a) quel est le total en argent des réductions de l’aide publique au développement; b) quel est le total en argent des réductions de l’aide autre que l’aide publique au développement; c) quel est le total en argent des réductions touchant les coûts administratifs de l’Agence canadienne de développement international (ACDI); d) quand les plans de restructuration de l’ACDI seront-ils annoncés; e) quel est le total en argent des r ...[+++]


80. Demands in this connection a detailed financial statement of the costs already incurred, and those projected for the next 20 years, in respect of the KAD building in Luxembourg, and insists that the expected total costs of construction, estimated operating costs and other expenditure arising in connection with the construction and operation of this building, be published in detail;

80. demande à cet égard un état détaillé des coûts déjà exposés et des coûts prévus pour les 20 prochaines années concernant le bâtiment KAD à Luxembourg et réclame la publication détaillée des coûts totaux prévus pour la construction, des coûts de fonctionnement estimés et des autres coûts relatifs à la construction et au fonctionnement du bâtiment;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
82. Demands in this connection a detailed financial statement of the costs already incurred, and those projected for the next 20 years, in respect of the KAD building in Luxembourg, and insists that the expected total costs of construction, estimated operating costs and other expenditure arising in connection with the construction and operation of this building, be published in detail;

82. demande à cet égard un état détaillé des coûts déjà exposés et des coûts prévus pour les 20 prochaines années concernant le bâtiment KAD à Luxembourg et réclame la publication détaillée des coûts totaux prévus pour la construction, des coûts de fonctionnement estimés et des autres coûts relatifs à la construction et au fonctionnement du bâtiment;


Question No. 165 Hon. John McKay: With respect to the opening of the Department of National Defence (DND) offices at 3500 Carling Avenue, Ottawa, Ontario, also known as the Nortel Campus: (a) what was the total cost to open the facility for use by DND, broken down by (i) the initial cost to purchase the land and facilities, (ii) the cost to renovate the facilities to make it operational for DND purposes; (b) how many staff are currently operating from the Nortel Campus and is this the full complement that the facility will accommodat ...[+++]

Question n 165 L'hon. John McKay: En ce qui concerne l’ouverture des bureaux du ministère de la Défense nationale (MDN) au 3500, avenue Carling, à Ottawa, en Ontario, aussi connu sous le nom de Campus Nortel: a) quel a été le coût total de l’ouverture de ces bureaux pour le MDN, ventilé par (i) le coût initial de l’achat du terrain et des locaux, (ii) le coût de la rénovation des locaux pour les rendre opérationnels aux fins du MDN; b) combien de personnes travaillent-ell ...[+++]


(Return tabled) Question No. 516 Mr. Francis Valeriote: With regard to the Federal Economic Development Agency for Southern Ontario (FedDev Ontario): (a) what are the terms, cost, and length of the leases signed at each of the Agency’s offices in Kitchener, Peterborough, and Stratford; (b) what is the total operating budget for each of FedDev Ontario’s offices in Ottawa, Toronto, Kitchener, Peterborough and Stratford; (c) what is the total dollar amount from the Agency’s 2009-2010 funds to be spent on the cost of administering the c ...[+++]

(Le document est déposé) Question n 516 M. Francis Valeriote: En ce qui concerne l’Agence fédérale de développement économique pour le Sud de l'Ontario (FedDev Ontario): a) quels sont le coût, les conditions et la durée des baux de location visant chacun des bureaux de l’Agence à Kitchener, Peterborough et Stratford; b) quel est le budget de fonctionnement total de chacun des bureaux de FedDev Ontario à Ottawa, Toronto, Kitchener, Peterborough et Stratford; c) quel montant total, en dollars, de ses fonds pour l’exercice 2009-2010 l’ ...[+++]


"cost-optimal level" means the level where the cost-benefit analysis calculated over the life-cycle of a building is positive , taking into account at least the net present value of investment and operating costs (including energy costs), maintenance , earnings from energy produced and, where applicable, disposal costs║;

"niveau optimal en fonction des coûts": le niveau, lorsque l'analyse coûts-bénéfices calculés sur la durée de vie d'un bâtiment est positive, qui prend au moins en compte la valeur actuelle nette d'investissement et les coûts de fonctionnement (y compris les coûts de l'énergie), la maintenance , les bénéfices provenant de l'énergie produite et, le cas échéant, les coûts d'élimination ║;


(10) "cost-optimal level" means the lowest level of costs during the life-cycle of a building, which are determined taking into account investment costs, maintenance and operating costs (including energy costs), earnings from energy produced, where applicable, and disposal costs, where applicable;

(10) "niveau optimal en fonction des coûts": le niveau le plus bas des coûts sur la durée de vie d'un bâtiment, déterminé en prenant en compte les coûts d'investissement, de maintenance et de fonctionnement (y compris les coûts de l'énergie), les bénéfices provenant de l'énergie produite, le cas échéant, et les coûts d'élimination, le cas échéant;


(10) "cost-optimal level" means the level where the cost-benefit analysis calculated over the life-cycle of a building is positive, taking into account at least the net present value of investment and operating costs (including energy costs), maintenance, earnings from energy produced and disposal costs, where applicable.

(10) "niveau optimal en fonction des coûts": le niveau, lorsque l’analyse coûts-bénéfices calculés sur la durée de vie d'un bâtiment est positive, qui prend au moins en compte la valeur actuelle nette d'investissement et les coûts de fonctionnement (y compris les coûts de l’énergie), la maintenance, les bénéfices provenant de l'énergie produite et les coûts d'élimination, le cas échéant.


w