Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Ambursen dam
Ambursen slab and buttress dam
CRT based flight deck
CRT configured flight deck
Cathode ray tube-based flight deck
Cathode ray tube-configured flight deck
Circular foundation
Deck dam
Deck fittings
Flat slab and buttress dam
Flat slab dam
Flat-deck buttress dam
Flat-deck dam
Flat-slab buttress dam
Flat-slab dam
Flat-slab deck dam
Flush deck fitting
Flush deck insert
Flush foundation
Free fit
Hurricane deck
Install stage decks
Promenade deck
Push fit
Raised deck vessel
Raised quarter deck vessel
Raised quarter-deck ship
Raised-deck vessel
Screw plug
Set up stage deck
Set up stage decks
Setting up stage decks
Shade deck
Shrink fit
Shrinkage fit
Shrunk fit
Shrunk-on fit
Slab and buttress dam
Sliding fit
Slip fit
Stud bushing with plugging screw
Sun deck

Translation of "Deck fittings " (English → French) :

TERMINOLOGY
see also In-Context Translations below




flush deck fitting [ flush deck insert | flush foundation | circular foundation | stud bushing with plugging screw | screw plug ]

crapaudine à plat pont [ boutonnière à plat pont | insert de pont avec bouchon vissable ]


cathode ray tube-based flight deck | cathode ray tube-configured flight deck | CRT based flight deck | CRT configured flight deck

poste de pilotage doté d'écrans


set up stage deck | setting up stage decks | install stage decks | set up stage decks

installer des estrades


free fit | push fit | sliding fit | slip fit

ajustage appuyé | ajustage coulissant | ajustage glissant


shrink fit | shrinkage fit | shrunk fit | shrunk-on fit

ajustage fretté | calage à retrait


promenade deck | sun deck | shade deck | hurricane deck

pont promenade


raised deck vessel | raised-deck vessel | raised quarter deck vessel | raised quarter-deck ship

navire à pont surélevé | navire à pont arrière surélevé | raised-deck


flat-slab dam [ flat slab dam | flat-slab deck dam | flat-slab buttress dam | flat slab and buttress dam | flat-deck dam | flat-deck buttress dam | slab and buttress dam | deck dam | Ambursen dam | Ambursen slab and buttress dam ]

barrage à dalles planes [ barrage à contreforts à dalle plane | barrage à contreforts et dalle plane | barrage à bouchure en dalle plane | barrage à contreforts minces | barrage du type Ambursen ]
IN-CONTEXT TRANSLATIONS
(h) subject to paragraph (i), if the vehicle is stowed on a partially closed vehicle deck fitted with an overhead deluge sprinkler system,

h) sous réserve de l’alinéa i), si le véhicule est arrimé à un pont-garage partiellement fermé qui est muni, au plafond, d’un système d’extincteurs automatiques déluge :


9 (1) Vehicular decks fitted with deluge type sprinklers shall have adequate provision for disposing of the accumulation of water that might ensue in case of fire.

9 (1) Les ponts à véhicules munis de diffuseurs du type « déluge » devront disposer de moyens suffisants pour évacuer l’accumulation d’eau qui pourrait se produire en cas d’incendie.


(9) Where the tween deck of a fishing vessel is situated at least 760 mm or two per cent of the length, whichever is the greater, above the deepest load water line, side scuppers may be fitted if an automatic non-return valve with positive means of closing it from the tween deck space and with extended spindles to the weatherdeck is fitted to each scupper.

(9) Lorsque l’entrepont se trouve à 760 mm au moins ou de deux pour cent de la longueur, selon celle des deux valeurs qui est la plus grande, au-dessus de la ligne de flottaison en charge la plus basse, peuvent être installés des dalots à condition que chacun d’eux soit pourvu d’une soupape automatique de non-retour munie de dispositifs permettant de la fermer directement de l’entrepont et de tiges de commande montant jusqu’au pont découvert.


(2) The hull, superstructure and deckhouses shall be subdivided by bulkheads consisting of “A” Class divisions into main vertical zones; the mean length of each zone, above the bulkhead deck, shall not exceed 40 m; any steps in the bulkheads shall consist of “A” Class divisions; in the case of railway car ferries (which does not include automobile carrying ships) where it is impracticable to fit fire-resisting bulkheads on the car deck, the car deck shall be completely isolated from the passenger spaces by fire-resisting bulkheads, doors and decks.

(2) La coque, les superstructures et les roufs seront divisés en tranches verticales principales par des cloisons du type A. La longueur moyenne de chaque tranche, au-dessus du pont de cloisonnement, ne dépassera pas 40 m. Toute baïonnette consistera en une cloison type A. Dans le cas des transbordeurs de wagons (ce qui ne comprend pas les navires transportant des automobiles), s’il est impossible de poser des cloisons résistant au feu sur le pont à wagons, ce dernier devra être complètement isolé des espaces à passagers par des cloisons, portes et ponts résistant au feu.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
(g) every corridor bulkhead that is not required to be a class A-60 division shall be a class B-15 division and extend from deck to deck or, when continuous class B-15 divisions that are ceilings are fitted, from the deck to the continuous ceiling;

g) les cloisons de corridor qui n’ont pas à être des cloisonnements de classe A-60 doivent être des cloisonnements de classe B-15 et s’étendre d’un pont à l’autre ou, en présence de plafonds faits de cloisonnements de classe B-15 continus, du pont au plafond;


Directly at tank outlets the pipework for the distribution of fuels shall be fitted with a quick-closing valve that can be operated from the deck, even when the rooms in question are closed.

Les tuyauteries pour la distribution de combustibles liquides doivent être pourvues, à la sortie des citernes, d’un dispositif de fermeture rapide manœuvrable depuis le pont, y compris lorsque les locaux concernés sont fermés.


If the model is required to be fitted with barriers on deck and the barriers are less than the bulkhead height indicated below, the model is to be fitted with CCTV so that any “splashing over” and any accumulation of water on the undamaged area of the deck can be monitored.

Si le pont du modèle doit être équipé de barrières et que la hauteur de ces barrières est inférieure à celle prescrite ci-dessous, le modèle doit être doté d'un système de télévision en circuit fermé (CCTV), de manière à observer les projections et l'accumulation d'eau dans la partie non endommagée du pont.


on enclosed decks, the vessel is equipped with an appropriate forced ventilation system and it is fitted with an alarm system and an adequate secondary source of power in case of failure;

sur les ponts fermés, le navire est équipé d'un système de ventilation forcée adéquat et qu'il dispose d'un système d'alarme et d'une source de courant supplémentaire adéquate en cas de défaillance;


on enclosed decks, the vessel is equipped with an appropriate forced ventilation system and it is fitted with an alarm system and an adequate secondary source of power in case of failure.

sur les ponts fermés, le navire est équipé d'un système de ventilation forcée adéquat et qu'il dispose d'un système d'alarme et d'une source de courant supplémentaire adéquate en cas de défaillance.


(a) "container ships" shall mean ships designed with a single deck hull with an arrangement of holds to carry containers (standard or non-standard; refrigerated or non-refrigerated), whose holds are fitted with cell guides to facilitate the positioning of the containers, as may be some of the deck storage space.

a) "navires porte-conteneurs": navires à pont unique dont les cales sont aménagées pour recevoir des conteneurs (normalisés ou hors normes, réfrigérés ou non) et sont équipées de glissières cellulaires destinées à faciliter le positionnement des conteneurs, équipements dont peuvent également être pourvues certaines aires de saisissage situées sur le pont.


w