Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Cableway installation designed to carry passengers
Cableway installation designed to carry persons
Characteristics of track geometry
Design engineer
Design floor
Designated standard clock
Field installation engineer
Flooring design
Geometric Design Guide for Canadian Roads
Geometrical features of railway design
Geometrical requirements of rails
Installation design standards
Installation engineer
Plan floor installation
Selection of floor materials
Standardized architecture design
Standardized design
Standards of track geometry
Structural installation engineer

Traduction de «Installation design standards » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
installation design standards

normes de conception ou de construction des installations fixes


installation design standards

normes de conception ou de construction des installations fixes


cableway installation designed to carry passengers | cableway installation designed to carry persons

installation à câbles transportant des personnes | installation à câbles transportant du public


flooring design | plan floor installation | design floor | selection of floor materials

concevoir un plancher


Geometric Design Guide for Canadian Roads [ Geometric Design Standards for Canadian Roads and Streets | Manual of Geometric Design Standards for Canadian Roads ]

Guide canadien de conception géométrique des routes [ Normes canadiennes de conception géométrique des routes | Normes canadiennes de conception géométrique des routes ]


Guidelines for the development of limit states design standards

Guidelines for the development of limit states design standards


standardized architecture design [ standardized design ]

design standardi


designated standard clock

horloge réglementaire désignée


field installation engineer | structural installation engineer | design engineer | installation engineer

ingénieur montage | ingénieur montage/ingénieure montage | ingénieure montage


geometrical features of railway design | geometrical requirements of rails | characteristics of track geometry | standards of track geometry

normes sur la géométrie des voies
TRADUCTIONS EN CONTEXTE
In order to facilitate conformity assessment with those requirements it is necessary to provide for presumption of conformity for cableway installations, subsystems and safety components which are in conformity with harmonised standards that are adopted in accordance with Regulation (EU) No 1025/2012 for the purpose of expressing detailed technical specifications of those requirements, especially with regard to the design, construction and o ...[+++]

Afin de faciliter l'évaluation de la conformité à ces exigences, il est nécessaire de prévoir une présomption de conformité pour les installations à câbles, les sous-systèmes et les composants de sécurité qui sont conformes aux normes harmonisées adoptées en application du règlement (UE) nº 1025/2012 aux fins de la formulation des spécifications techniques détaillées de ces exigences, notamment en ce qui concerne la conception, la construction et l'exploitation des installations à câbles.


In order to facilitate conformity assessment with those requirements it is necessary to provide for presumption of conformity for cableway installations which are in conformity with harmonised standards that are adopted in accordance with Regulation (EU) No 1025/2012 for the purpose of expressing detailed technical specifications of those requirements, especially with regard to the design, construction and operation of cableway ins ...[+++]

Afin de faciliter l'évaluation de la conformité à ces exigences, il est nécessaire de prévoir une présomption de conformité pour les installations à câbles qui sont conformes aux normes harmonisées adoptées en application du règlement (UE) nº 1025/2012 aux fins de la formulation des spécifications techniques détaillées de ces exigences, notamment en ce qui concerne la conception, la construction et l'exploitation des installations à câbles.


(II) equipment that is part of a ground source heat pump system that transfers heat to or from the ground or groundwater (but not to or from surface water such as a river, a lake or an ocean) and that, at the time of installation, meets the standards set by the Canadian Standards Association for the design and installation of earth energy systems, including such equipment that consists of piping (including above or below ground piping and the cost of drilling a well, or tr ...[+++]

(II) soit du matériel qui fait partie d’un système de pompe géothermique qui transfère la chaleur vers le sol ou l’eau souterraine, ou émanant de ceux-ci (mais non vers l’eau de surface tels une rivière, un lac ou un océan, ou émanant de ceux-ci) et qui, au moment de l’installation, répond aux normes de l’Association canadienne de normalisation en matière de conception et d’installation des systèmes géothermiques, y compris le matériel de ce type qui consiste en tuyauterie (incluant la tuyauterie hors-sol ou souterraine et le coût de forage d’un puits ou de creusement d’une tranchée en vue de l’installation de cette tuyauterie), en matér ...[+++]


2.9 (1) A fixed ladder installed after the day of the coming into force of this section shall be designed, constructed and installed in accordance with the requirements of ANSI Standard A14.3-1984 entitled American National Standard for Ladders — Fixed — Safety Requirements, as amended from time to time, other than section 7 of that Standard.

2.9 (1) La conception, la construction et l’installation de toute échelle fixe dont l’installation est postérieure à l’entrée en vigueur du présent article doivent être conformes aux exigences de la norme ANSI A14.3-1984 intitulée American National Standard for Ladders — Fixed — Safety Requirements, avec ses modifications successives, à l’exception de l’article 7 de celle-ci.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
4 (1) Every new installation shall be designed, constructed, installed and commissioned in accordance with a quality assurance program that complies with subsection (2) and that is selected in accordance with Canadian Standards Association CAN3-Z299.0-86, Guide for Selecting and Implementing the CSA Z299-85 Quality Program Standards.

4 (1) Toute nouvelle installation doit être conçue, construite, mise en place et mise en service aux termes d’un programme d’assurance de la qualité établi conformément au paragraphe (2) et choisi conformément au Guide de sélection et de mise en pratique des normes CAN3-Z299-85 de programme d’assurance de la qualité, CAN3-Z299.0-86 de l’Association canadienne de normalisation.


4 (1) Every new installation shall be designed, constructed, installed and commissioned in accordance with a quality assurance program that complies with subsection (2) and that is selected in accordance with Canadian Standards Association CAN3-Z299.0-86, Guide for Selecting and Implementing the CAN3-Z299-85 Quality Assurance Program Standards.

4 (1) Toute nouvelle installation doit être conçue, construite, mise en place et mise en service aux termes d’un programme d’assurance de la qualité établi conformément au paragraphe (2) et choisi conformément au Guide de sélection et de mise en pratique des normes CAN3-Z299-85 de programme d’assurance de la qualité, CAN3-Z299.0-86 de l’Association canadienne de normalisation.


4 (1) Every new installation shall be designed, constructed, installed and commissioned in accordance with a quality assurance program that complies with subsection (2) and that is selected in accordance with Canadian Standards Association CAN3-Z299.0-86, Guide for Selecting and Implementing the CAN3-Z299-85 Quality Program Standards.

4 (1) Toute nouvelle installation doit être conçue, construite, mise en place et mise en service aux termes d’un programme d’assurance de la qualité établi conformément au paragraphe (2) et choisi conformément au Guide de sélection et de mise en pratique des normes CAN3-Z299-85 de programme d’assurance de la qualité, CAN3-Z299.0-86 de l’Association canadienne de normalisation.


pipelines comprising piping or a system of piping designed for the conveyance of any fluid or substance to or from an installation (onshore or offshore) starting from and including the last isolation device located within the confines of the installation, including all the annexed equipment designed specifically for pipelines; this exclusion shall not apply to standard pressure equipment such as may be found in pressure reduction ...[+++]

aux canalisations comprenant une tuyauterie ou un ensemble de tuyauteries destinées au transport de tout fluide ou matière vers une ou à partir d'une installation (sur terre ou en mer), à partir du, et y compris le, dernier organe d'isolement situé dans le périmètre de l'installation, y compris tous les équipements annexes qui sont spécifiquement conçus pour la canalisation; cette exclusion ne couvre pas les équipements sous pression standard tels que ceux qui peuvent se trouver dans les postes de détente et dans ...[+++]


3.3.1. When the design is not entirely in accordance with harmonised standards, the notified body shall ascertain whether the design conforms to the essential health and safety requirements set out in Annex I and, if it does, issue an EU design examination certificate to the installer, stating the limits of the certificate's validity and giving the details required for identification of the approved design.

3.3.1. Lorsque la conception n’est pas entièrement conforme aux normes harmonisées, l’organisme notifié examine si la conception est conforme aux exigences essentielles de sécurité et de santé énoncées à l’annexe I et, dans ce cas, délivre une attestation d’examen UE de la conception à l’installateur en précisant les limites de validité de cette attestation et les données nécessaires à l’identification de la conception approuvée.


6. Calls again for the Member States, particularly in view of the accession negotiations, to reach a minimum degree of agreement on nuclear safety standards at EU level, preferably via a Directive based on Article 203 of the Euratom Treaty, establishing harmonised minimum standards in the EU for the safe and reliable design, construction and operation of all nuclear installations, to implement generally agreed international safety ...[+++]

6. invite à nouveau les États membres, particulièrement dans la perspective des négociations d'adhésion, à dégager un consensus minimal sur les normes relatives à la sécurité nucléaire au niveau de l'UE, de préférence par le biais d'une directive basée sur l'article 203 du traité Euratom; cette directive harmoniserait les normes minimales au sein de l'UE en matière de sécurité et de fiabilité de la conception, de la construction et de l'exploitation de l'ensemble des installations nucléaires en vue d'appliquer des normes de sécurité générales arrêtées au niveau international sur la base des travaux de l'Agence internationale de l'énergi ...[+++]


w