Activation overvoltage
External hydraulic power
External hydraulic power source
External hydraulic source
External hydraulic test stand
High potential test
High-potential test
High-potting
High-voltage test
Hydraulic test stand
Ohmic overpotential
Ohmic overvoltage
Overvoltage
Overvoltage test
Pechiney overvoltage method
Phase-to-earth overvoltage per unit
Phase-to-ground overvoltage per unit
Resistance overpotential
Resistance overvoltage
Solution ir drop
Surge
Test program
Test programme
Test stand

Translation of "Overvoltage test " (English → French) :

TERMINOLOGY
see also In-Context Translations below
high-voltage test [ high potential test | high-potential test | high-potting | overvoltage test ]

essai diélectrique [ essai sous tension élevée ]


ohmic overpotential | ohmic overvoltage | resistance overpotential | resistance overvoltage | solution ir drop

surtension de résistance | surtension ohmique


phase-to-earth overvoltage per unit | phase-to-ground overvoltage per unit

valeur relative d'une surtension phase-terre






Pechiney overvoltage method

méthode de surtension de Pechiney






external hydraulic test stand | external hydraulic power | external hydraulic power source | external hydraulic source | hydraulic test stand | test stand

appareil d'essais hydrauliques mobile | appareil d'essai hydraulique hors bord


test program (1) | test programme (2)

programme d'essais
IN-CONTEXT TRANSLATIONS
Note : The aim of the tests in accordance with clause 3.3.2.1 is essentially to ensure, on the one hand, the quality of the insulation of the voltage winding between turns or between layers and, on the other hand, the insulation between different circuits of the meter which in normal service are connected to conductors of different phases of the mains between which overvoltage may occur.

Note : Les essais, selon le point 3.3.2.1, ont essentiellement pour but de s'assurer, d'une part, de la qualité de l'isolation des enroulements de tension entre spires ou entre couches et, d'autre part, de l'isolation entre différents circuits du compteur qui sont branchés, en service normal, à des conducteurs de phases différentes du réseau et entre lesquelles des surtensions peuvent apparaître.


The impulse voltage test is intended to determine the capability of the meter to with-stand without damage short-time overvoltage of high values.

Les essais à la tension de choc sont prévus pour déterminer l'aptitude du compteur à résister sans dommage aux surtensions de courte durée mais de valeur élevée.


w