Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Dynamically positioned semi-submersible drill rig
Dynamically positioned semisubmersible drilling rig
Sem
Semi
Semi-submersible
Semi-submersible barge
Semi-submersible drilling unit
Semi-submersible platform
Semi-submersible rig
Semisubmersible
Semisubmersible drilling platform
Semisubmersible drilling rig
Semisubmersible drilling unit
Semisubmersible platform
Semisubmersible rig

Traduction de «dynamically positioned semi-submersible drill rig » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
dynamically positioned semisubmersible drilling rig [ dynamically positioned semi-submersible drill rig ]

installation de forage semisubmersible à positionnement dynamique


semisubmersible platform [ semi-submersible platform | semisubmersible drilling platform | semisubmersible drilling rig | semi-submersible drilling unit | semisubmersible drilling unit | semi-submersible rig | semisubmersible rig | semisubmersible | semi-submersible | semi | semi-submersible barge | sem ]

plate-forme semisubmersible [ plateforme semi-submersible | plate-forme de forage semi-submersible | barge semi-submersible | semi-submersible | plateforme de forage semi-submersible ]
TRADUCTIONS EN CONTEXTE
As evening rolled into night, the semi-submersible drill rig, the Ocean Ranger, capsized in the North Atlantic 267 kilometres east of Cape Spear, Newfoundland.

À la tombée de la nuit, la plate-forme semi-submersible Ocean Ranger a chaviré dans l'Atlantique Nord à 267 kilomètres à l'est du cap Spear, au large de Terre-Neuve.


While undertaking exploratory drilling near the Hibernia oil field, 170 nautical miles east of St. John's, the Ocean Ranger, the Titanic of semi-submersible oil rigs, capsized and sank in a severe weather storm.

Alors qu'il effectuait des opérations de forage d'exploration près du champ pétrolifère Hibernia, à 170 milles marins à l'est de St. John's, l'Ocean Ranger, le Titanic des plates-formes de forage semisubmersibles, a basculé et coulé au cours d'une violente tempête.


To recap, we have two drilling rigs, both semi-submersible, both anchored, one supporting development operations and one supporting exploration, plus a producing facility at the White Rose field, which is a floating production and storage and off-loading facility, and then the North Amethyst field, which is in production and is tied back into the White Rose.

En résumé, nous avons deux installations de forage, toutes deux semi-submersibles, toutes deux ancrées; une de ces plates-formes appuie nos activités d'exploitation tandis que l'autre appuie nos activités d'exploration. En outre, nous avons une installation de production, de stockage et de délestage dans le champ White Rose, et nous exploitons le gisement North Amethyst, rattaché au champ White Rose.




datacenter (1): www.wordscope.ca (v4.0.br)

'dynamically positioned semi-submersible drill rig' ->

Date index: 2021-12-23
w