Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Activities performed with ship deck equipment
Ambursen dam
Ambursen slab and buttress dam
Anchor deck
Auto deck
Bridge deck drainage
CRT based flight deck
CRT configured flight deck
Car deck
Cathode ray tube-based flight deck
Cathode ray tube-configured flight deck
Deck dam
Deck drainage
Ensure suitable quantity of deck equipment
Flat slab and buttress dam
Flat slab dam
Flat-deck buttress dam
Flat-deck dam
Flat-slab buttress dam
Flat-slab dam
Flat-slab deck dam
Fo'c'sle deck
Foc'sle deck
Forecastle deck
Functions of deck equipment on vessels
Functions of ship deck equipment
Functions of vessel deck equipment
Handle deck equipment
Hurricane deck
Install stage decks
Open cut drainage
Open ditch drainage
Open ditch draining
Open-channel drainage
Opening drainage
Prepare deck equipment
Promenade deck
Set up stage deck
Set up stage decks
Setting up stage decks
Shade deck
Slab and buttress dam
Sun deck
Surface drainage
Waggon deck

Traduction de «deck drainage » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
bridge deck drainage [ deck drainage ]

drainage de tablier


open cut drainage | open ditch drainage | open ditch draining | open-channel drainage | opening drainage | surface drainage

drainage à ciel ouvert | drainage à fossé ouvert | drainage par canaux | drainage par fossé | drainage par fossés | drainage par fossés ouverts


ensure suitable quantity of deck equipment | handle deck equipment | ensure appropriate quantity and location of deck equipment | prepare deck equipment

préparer les équipements des ponts


activities performed with ship deck equipment | functions of ship deck equipment | functions of deck equipment on vessels | functions of vessel deck equipment

fonctions des équipements du pont d'un navire


set up stage deck | setting up stage decks | install stage decks | set up stage decks

installer des estrades


cathode ray tube-based flight deck | cathode ray tube-configured flight deck | CRT based flight deck | CRT configured flight deck

poste de pilotage doté d'écrans


flat-slab dam [ flat slab dam | flat-slab deck dam | flat-slab buttress dam | flat slab and buttress dam | flat-deck dam | flat-deck buttress dam | slab and buttress dam | deck dam | Ambursen dam | Ambursen slab and buttress dam ]

barrage à dalles planes [ barrage à contreforts à dalle plane | barrage à contreforts et dalle plane | barrage à bouchure en dalle plane | barrage à contreforts minces | barrage du type Ambursen ]


forecastle deck [ foc'sle deck | fo'c'sle deck | anchor deck ]

pont de gaillard [ pont de gaillard d'avant | plage avant | pont teugue | pont avant | pont de la teugue ]


promenade deck | sun deck | shade deck | hurricane deck

pont promenade


TRADUCTIONS EN CONTEXTE
8 (1) Efficient drainage by pipes or channels shall be provided for every part of the crew accommodation situated on an open deck wherever such drainage is necessary for clearing water shipped from the sea.

8 (1) Des tuyaux ou des rigoles d’assèchement assureront efficacement l’écoulement de l’eau de mer embarquée, partout où cela est nécessaire, dans chaque partie du logement de l’équipage donnant sur un pont découvert.


(b) provision is made for the drainage or absorption of urine from all decks or levels.

b) qu’un système d’égouttement ou d’absorption de l’urine ne soit prévu à tous les ponts ou niveaux.


(4) The freeing ports shall be distributed in a manner that achieves the maximum speed of drainage from the decks.

(4) Les sabords de décharge doivent être répartis de façon à permettre que l’eau des ponts s’écoule le plus rapidement possible.


(11) Where side scuppers are not fitted on a fishing vessel, drainage sumps connected directly to the suction of the offal pump, or to a similar pump, shall be provided at the forward and after ends of the fish processing tween deck area.

(11) Lorsqu’il n’y a pas de dalots, des puisards directement reliés au tuyau d’aspiration de la pompe à déchets ou à une pompe analogue sont installés aux extrémités avant et arrière de l’espace affecté au traitement du poisson dans l’entrepont.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
the tightness of transverse or longitudinal bulkheads which are taken into account as effective to confine the assumed accumulated sea water in the compartment concerned in the damaged ro-ro deck shall be commensurate with the drainage system, and shall withstand hydrostatic pressure in accordance with the results of the damage calculation.

les cloisons transversales ou longitudinales qui sont considérées comme efficaces pour retenir le volume hypothétique d'eau de mer accumulée dans le compartiment concerné sur le pont roulier endommagé doivent avoir une étanchéité en rapport avec le système d'assèchement, et doivent résister à la pression hydrostatique donnée par les résultats des calculs d'avarie.


The drainage system shall be of appropriate capacity to drain fluids from pens and decks under all conditions.

La capacité du système de drainage doit être suffisante pour drainer les fluides des enclos et des ponts en toutes circonstances.


The drainage system shall be of appropriate capacity to drain fluids from pens and decks under all conditions.

La capacité du système de drainage doit être suffisante pour drainer les fluides des enclos et des ponts en toutes circonstances.


Means for drainage of water can only be considered as effective if these means are of a capacity to prevent large amounts of water from accumulating on the deck ie many thousand of tonnes per hour which is far beyond the capacities fitted at the time of the adoption of these regulations.

Seuls sont considérés comme efficaces les dispositifs d'assèchement dont la capacité est telle qu'ils peuvent empêcher l'accumulation d'importants volumes d'eau sur le pont, soit plusieurs milliers de tonnes par heure, ce qui dépasse largement les capacités disponibles au moment de l'adoption des présentes prescriptions.


3 the tightness of transverse or longitudinal bulkheads which are taken into account as effective to confine the assumed accumulated sea water in the compartment concerned in the damaged ro-ro deck shall be commensurate with the drainage system, and shall withstand hydrostatic pressure in accordance with the results of the damage calculation.

les cloisons transversales ou longitudinales qui sont considérées comme efficaces pour retenir le volume hypothétique d'eau de mer accumulée dans le compartiment concerné sur le pont roulier endommagé doivent avoir une étanchéité en rapport avec le système d'assèchement, et doivent résister à la pression hydrostatique donnée par les résultats des calculs d'avarie.


w