Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Integrated truss structure P3
Integrated truss structure P4
Integrated truss structure-port four
Integrated truss structure-port three
P3
P3 truss
P4
P4 truss
Second left side truss segment
Second left-side truss segment
Second port truss segment
Segment P3 and P4
Truss segment P3
Truss segment P4

Traduction de «integrated truss structure p3 p4 » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
second port truss segment [ second left-side truss segment | second left side truss segment | P3/P4 truss segment | integrated truss structure P3/P4 | P3/P4 truss | port-side P3/P4 truss | port side P3/P4 truss | segment P3 and P4 ]

deuxième segment bâbord de la poutrelle [ segment de poutre intégrée P3-P4 | segment de poutre P3-P4 | segment P3-P4 ]


P3 truss [ P3 | integrated truss structure P3 | integrated truss structure-port three | truss segment P3 ]

poutre P3 [ P3 | segment de poutre intégrée P3 ]


P4 truss [ P4 | integrated truss structure P4 | integrated truss structure-port four | truss segment P4 ]

poutre P4 [ P4 | segment de poutre intégrée P4 ]
TRADUCTIONS EN CONTEXTE
Question No. 899 Mr. Hoang Mai: With regard to the proposed new bridge on the St. Lawrence River: (a) why did the 2012 budget not include long-term planning for the proposed bridge; (b) have the cost estimates been further refined since initial estimates of between three and five billion dollars were made, and how are these estimated costs broken down, in as much detail as possible; (c) what further factors need to be taken into account to refine the estimates; (d) at what time in the financial analysis process will the Treasury Board of Canada or the Department of Finance be involved and to what extent; (e) has Transport Canada chosen the funding model and, if so, which one, and why; (f) will there be any public consultation concernin ...[+++]

Question n 899 M. Hoang Mai: En ce qui a trait au projet de nouveau pont sur le fleuve Saint-Laurent: a) pourquoi n’a-t-on pas fait état, dans le budget de 2012, de la planification à long terme du pont projeté; b) les estimations de coûts ont-elles été précisées depuis que les estimations initiales de trois à cinq milliards de dollars ont été avancées, et comment ces coûts estimés sont-ils ventilés, de façon aussi détaillée que possible actuellement; c) quels autres facteurs faut-il prendre en compte pour préciser les estimations; d) à quel moment du processus d’analyse financière le Conseil du Trésor du Canada ou le ministère des Fi ...[+++]




datacenter (1): www.wordscope.ca (v4.0.br)

'integrated truss structure p3 p4' ->

Date index: 2021-09-17
w