Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Content of parkland strategies
Flood control project
Flood mitigation project
Flood protection project
Green space strategies
Limitation in audit scope
Limitation in scope
Limitation in the scope of the audit
Limitation in the scope of the auditor's examination
Limitation on scope
Manage bridge construction projects
Manage bridge development projects
Project Scope Agreement
Project definition
Project objective
Project scope
Scope definition
Scope limitation
Scope of a project
Scope of green space strategies
Scope of parkland strategies
Scope of wildlife projects
Scope restriction
Types of habitat projects
Types of wildlife projects
Wildlife projects

Translation of "project scope " (English → French) :

TERMINOLOGY
see also In-Context Translations below
project scope [ scope of a project ]

portée d'un projet




Project Scope Agreement

Entente relative à la portée du projet




scope of wildlife projects | types of wildlife projects | types of habitat projects | wildlife projects

projets de conservation de la faune et la flore sauvages


scope limitation | limitation on scope | limitation in audit scope | limitation in scope | limitation in the scope of the audit | limitation in the scope of the auditor's examination | scope restriction

limitation de l'étendue de l'audit | limitation du travail de vérification | limitation du travail de révision | limitation des travaux | limitation de l'étendue des travaux | limitation de l'étendue de la vérification | limitation de l'étendue


scope definition | project definition

définition de projet


conduct project management activities for bridge construction projects | manage bridge development projects | manage bridge construction projects | undertake project management for bridge development projects

gérer des projets de construction de ponts


scope of green space strategies | scope of parkland strategies | content of parkland strategies | green space strategies

stratégies en matière d’espaces verts


flood protection project | flood control project | flood mitigation project

projet de protection contre les crues
IN-CONTEXT TRANSLATIONS
– a review of the project for the new Financial Management System (FMS) - Phase 1: Project scope, governance, resources & risk management;

un examen du projet de nouveau système de gestion financière (FMS) – phase 1: portée du projet, gouvernance, gestion des ressources et des risques;


- a review of the project for the new Financial Management System (FMS) - Phase 1: Project scope, governance, resources risk management;

- un examen du projet de nouveau système de gestion financière (FMS) – phase 1: portée du projet, gouvernance, gestion des ressources et des risques;


Question No. 29 Mr. Peter Julian: With regard to the 267,000 cubic meters of low and intermediate level radioactive wastes that are stored above ground in concrete containers at the Chalk River Laboratories: (a) what is the long-term plan for the containment and safe storage of these wastes; (b) how has the safety of these containers been demonstrated and what is their design life; (c) how has their long term performance been (i) evaluated, (ii) verified; (d) is there an update on the proposed deep geological repository at the Chalk River property and what is (i) the project description, (ii) the project scope; (e) how much will the ...[+++]

Question n 29 M. Peter Julian: En ce qui concerne les 267 000 mètres cubes de déchets faiblement et moyennement radioactifs qui sont entreposés hors terre dans des conteneurs en béton sur le terrain des Laboratoires de Chalk River: a) quel est le plan à long terme pour le confinement et l’entreposage sûrs de ces déchets; b) comment a-t-on démontré la sécurité de ces conteneurs et quelle en est la durée de vie nominale; c) comment a-t-on (i) évalué et (ii) vérifié leur rendement à long terme; d) existe-t-il une mise à jour du projet de dépôt géologique en profondeur sur le terrain des Laboratoires de Chalk River et quelle est (i) la de ...[+++]


The site suitability assessment is not yet complete and, as such, neither a project description nor a project scope has been developed.

L’évaluation du site n’est pas encore terminée et aucune description ou portée du projet n’a donc été élaborée.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
5. Considers that the extension of the thematic scope of LIFE, the broadening of its geographical scope and the addition of new types of projects should not lead to a replacement of the successful existing projects and thus be reflected in a significant increase of the Programme's overall envelope. Furthermore, stresses the urgency of providing adequate funding for the Union's biodiversity through support of the Natura 2000 network and is convinced that LIFE should contribute at least 10 % to the annual Natura 2000 funding needs of EU ...[+++]

5. estime que l'extension de la portée thématique et géographique de LIFE et l'ajout de nouveaux types de projets ne devraient pas avoir pour effet de mettre un terme à des projets efficaces pour les remplacer, mais devraient plutôt se traduire par une augmentation significative du budget total du programme; souligne en outre qu'il est urgent de financer adéquatement la biodiversité dans l'Union en soutenant le réseau Natura 2000, exprime sa conviction que LIFE devrait contribuer aux besoins de financement de Natura 2000 (5,8 milliards d'euros) à hauteur de 10 % au moins et estime que la part de financement restante doit être couverte p ...[+++]


40. Considers, within the scope of the revision of the guidelines on budgetary support by the Commission, that particular attention must be given to supervisory and control systems; expects the Commission to strengthen the monitoring and annual reporting on the compliance with the eligibility criteria; recalls that capacity building projects within the scope of budgetary support operations are subject to the same supervisory and control system as any other project, which includes audits;

40. considère, dans le cadre de la révision par la Commission des orientations sur l'appui budgétaire, qu'une attention particulière doit être consacrée aux systèmes de surveillance et de contrôle; attend de la Commission qu'elle renforce le contrôle et établisse des rapports annuels sur le respect des critères d'éligibilité; rappelle que les projets de renforcement des capacités dans le cadre d'opérations d'appui budgétaire sont soumis au même régime de contrôle et de surveillance que tout autre projet, ce qui inclut des audits;


40. Considers, within the scope of the revision of the guidelines on budgetary support by the Commission, that particular attention must be given to supervisory and control systems; expects the Commission to strengthen the monitoring and annual reporting on the compliance with the eligibility criteria; recalls that capacity building projects within the scope of budgetary support operations are subject to the same supervisory and control system as any other project, which includes audits;

40. considère, dans le cadre de la révision par la Commission des orientations sur l'appui budgétaire, qu'une attention particulière doit être consacrée aux systèmes de surveillance et de contrôle; attend de la Commission qu'elle renforce le contrôle et l'établissement des rapports annuels sur le respect des critères d'éligibilité; rappelle que les projets de renforcement des capacités dans le cadre d'opérations d'appui budgétaire sont soumis au même régime de contrôle et de surveillance que tout autre projet, ce qui inclut des audits;


It's an example of how we are able to position Canadians at a high level in a project value chain, offering engineering design, project scoping, and management capabilities.

C'est un exemple de la manière dont nous pouvons positionner les Canadiens au haut de l'échelle de valeur d'un projet, en offrant des compétences de conception technique, d'établissement de la portée des projets et de gestion.


These include inter alia: “screening” (determining whether an EIA is required for a specific project), “scoping” (identification of content of environmental impact study- EIS) and decision-making (authorising the project).

Il s'agit notamment de la phase d'appréciation (destinée à déterminer si un projet spécifique nécessite une EIE), de la définition de la portée (afin de définir la teneur de l'étude des incidences sur l'environnement) et de la prise de décision (autorisant le projet).


Departments are required to over program to allow for changes in scheduling, approval delays, project scope changes, unforecasted operational priorities and a host of additional program realities.

Les ministères doivent faire une programmation excédentaire pour permettre les modifications apportées au calendrier, les retards approuvés, les changements touchant le budget des projets, les priorités opérationnelles imprévues et toutes sortes d'autres réalités touchant les programmes.


w